Leach Wallace was commissioned to design the expansion of the 300,000 sf New Patient Tower at Holy Cross, located in Silver Spring, Maryland. The expansion of the hospital included a 150 bed patient tower, including a new central energy plant and major renovation to the existing front lobby for circulation to the new tower. The major site renovations included a large expansion to the existing parking garage, new site utilities, underground fuel oil storage tanks, generators on grade, and site lighting.

A new central energy plant was provided to the penthouse of the new bed tower to service the entire campus. The new central energy plant included included a 3,000+ ton chiller plant with variable flow primary pumping systems and rooftop cooking tower yard, 50,000 lb/hr high pressure steam plant with new feed water systems. It also included central air handling systems with energy recovery, general and critical exhaust systems, domestic hot water plant, as well as main electrical distribution rooms, stair pressurization systems, central elevator machine room and smoke purge.

At the basement and ground level floor new central campus normal power distribution, emergency power distribution and paralleling gear room, central fire pump, domestic water booster pump, and steam-to-hot water heating plant. For energy recovery, a 750 ton heat pump chiller was provided, which will pre-cool the campus return chilled water returning to the central plant in the penthouse, and rejects its heat through condenser water to a loop in the heating hot water plant. All major air distribution was delivered to the floors as medium pressure, with air terminal units in the spaces to maintain individual zone loads.

The project was designed to achieve a “certified rating” from the USGBC. In addition, Green Guides for Healthcare (GGHC) Facilities document was utilized to identify a list of proposed sustainable features. This facility is seeking LEED Silver.

Career Advancement Opportunities

April 2024 Investment Banking

  • Jefferies & Company 02 99.4%
  • Goldman Sachs 19 98.8%
  • Harris Williams & Co. New 98.3%
  • Lazard Freres 02 97.7%
  • JPMorgan Chase 03 97.1%

Overall Employee Satisfaction

April 2024 Investment Banking

  • Harris Williams & Co. 18 99.4%
  • JPMorgan Chase 10 98.8%
  • Lazard Freres 05 98.3%
  • Morgan Stanley 07 97.7%
  • William Blair 03 97.1%

Professional Growth Opportunities

April 2024 Investment Banking

  • Lazard Freres 01 99.4%
  • Jefferies & Company 02 98.8%
  • Goldman Sachs 17 98.3%
  • Moelis & Company 07 97.7%
  • JPMorgan Chase 05 97.1%

Total Avg Compensation

April 2024 Investment Banking

  • Director/MD (5) $648
  • Vice President (19) $385
  • Associates (87) $260
  • 3rd+ Year Analyst (14) $181
  • Intern/Summer Associate (33) $170
  • 2nd Year Analyst (66) $168
  • 1st Year Analyst (205) $159
  • Intern/Summer Analyst (146) $101
notes
16 IB Interviews Notes

“... there’s no excuse to not take advantage of the resources out there available to you. Best value for your $ are the...”

Leaderboard

1
redever's picture
redever
99.2
2
Secyh62's picture
Secyh62
99.0
3
BankonBanking's picture
BankonBanking
99.0
4
Betsy Massar's picture
Betsy Massar
99.0
5
CompBanker's picture
CompBanker
98.9
6
GameTheory's picture
GameTheory
98.9
7
kanon's picture
kanon
98.9
8
dosk17's picture
dosk17
98.9
9
Linda Abraham's picture
Linda Abraham
98.8
10
DrApeman's picture
DrApeman
98.8
success
From 10 rejections to 1 dream investment banking internship

“... I believe it was the single biggest reason why I ended up with an offer...”