Tax abatements in yield on cost calculation for development
For a school project, when modeling a stabilized yield on cost, would I include the present value of a tax abatement in my initial cost basis? I am seeking to purchase the property and develop a special purpose building. The abatement is not currently in place and would only be in place for the special purpose building. Assuming development costs of $600/SF, and NOI of $5.534MM, using a 4.5% cap rate and a 40% profit margin to come to a 6.30% yield on cost basis. My total development costs are $87,841,270, leaving a land residual value of $27,841,270. My uses for the development are currently $61.5MM in debt and $26.35MM in equity, but not sure where to incorporate the PV of the abatement in year 0. Should I just add the PV of the abatement to my development costs, increasing my proportional debt and equity? I assume doing so would lower my land residual value.
Quaerat vitae adipisci sapiente non corrupti. Fugiat veritatis dicta voluptatem. Necessitatibus omnis placeat sed est vel.
Est modi praesentium quis officia et nemo. Iure qui excepturi consequatur quae quasi a tenetur. Mollitia vero aperiam minima cumque architecto sequi.
Atque nemo voluptas distinctio veniam tempore commodi aliquid. Consequatur quo minus tempore id sequi facilis.
See All Comments - 100% Free
WSO depends on everyone being able to pitch in when they know something. Unlock with your email and get bonus: 6 financial modeling lessons free ($199 value)
or Unlock with your social account...