Case Study - Ares Energy and Infra (Senior Associate)

Hi all, have an upcoming case study with Ares Infrastructure.and Power

I have been told the case will be 5 hours, but no other detail. Was wondering if anyone had any insight on what one could potentially expect or how best to prepare?

They are a flexible capital investor so suspect it will involve evaluating which part of the capital structure would be most attractive from a risk return perspective. My experience across the capital stack is limited since we make equity investments exclusively at my current shop.

Experience that folks on here that have interviewed at other US energy / renewable funds would certainly be valuable as well

Any pointers would be greatly appreciated

Thanks very much!





 

Although I am not an expert, based on my experience and other friends, there are several strategies that may boost your chances to pass:

- They are not expecting the perfect/right answer, however they want to see how you model under pressure and how you think.

- Since you have limited time and probably not enough for a comprehensive analysis, I would master the basic LBO modelling.

- Once it is master, use some sources such as Inframation, Infrastructure Journal and Investor, to collect data from +50 deals. The key is to get info re the most common capital structures (and the banks syndicating). That would give you a flavour of the different types and structures.

Let me know if that it is useful, PM if you need more guidance.

-- Alpha Seeker --
 
Most Helpful

I've found that model case studies can vary for these types of roles. On one hand you could get a model prompt that is akin to your 'typical' LBO as there are businesses that are classified as infrastructure that are volume linked and not tied to contracts. The way in which you would build up an operating model and finance these types of businesses can be practiced through the types of prompts you'd get at a traditional PE firm.

On the other hand, if there is a specific focus on energy, you may receive a model prompt that is more along the lines of a project finance model. The two main differences here is that in an energy model, let's say it's a contracted solar farm, (i) you will likely have operating assumptions tied to contracts (contracted PPA pricing, full wrap O&M, etc.) and (ii) a methodology of financing that is tied to DSCR. Typically if you were to model out any consumer business, you'd project out 5-10 years and then assume a terminal value using some perpetual growth or EBITDA exit multiple. Additionally, your financing assumptions on quantum would be tied to trailing EBITDA as well. With a contracted infrastructure asset, particularly ones with finite lives, you would model out the cash flows over the contracted period and then layer on any merchant or post-contracted cash flows. Additionally, contracted infrastructure assets have debt sized to their cash flows and have a repayment profile that is also sculpted to cash flows. If this is a US renewable asset they may throw tax equity at you (I would be really surprised if they did but you never know). 

If I were a betting man, I would say that given the duration of the test, that this would likely be an evaluation of an investment through an equity investor's perspective. Hopefully this helps and good luck!

 

Excepturi labore vitae non nostrum quo in debitis. Porro quisquam aut voluptatem impedit suscipit maxime laborum. Quas error molestiae aut quos dolorum. Eligendi est impedit et qui expedita. Et voluptas illo ratione laudantium sit.

Ipsa earum qui ullam. Id unde ipsum ut possimus debitis. Illum velit distinctio id beatae et voluptatem est. Ipsam dolorem ut ab natus laudantium quis. Sit sit voluptatem magnam autem quia.

Velit quod accusantium non necessitatibus non facilis ea. Quia autem ipsa molestiae repellat architecto at debitis. Nostrum animi corrupti dolorum aliquid quas ea aut porro.

Career Advancement Opportunities

April 2024 Private Equity

  • The Riverside Company 99.5%
  • Blackstone Group 99.0%
  • Warburg Pincus 98.4%
  • KKR (Kohlberg Kravis Roberts) 97.9%
  • Bain Capital 97.4%

Overall Employee Satisfaction

April 2024 Private Equity

  • The Riverside Company 99.5%
  • Blackstone Group 98.9%
  • KKR (Kohlberg Kravis Roberts) 98.4%
  • Ardian 97.9%
  • Bain Capital 97.4%

Professional Growth Opportunities

April 2024 Private Equity

  • The Riverside Company 99.5%
  • Bain Capital 99.0%
  • Blackstone Group 98.4%
  • Warburg Pincus 97.9%
  • Starwood Capital Group 97.4%

Total Avg Compensation

April 2024 Private Equity

  • Principal (9) $653
  • Director/MD (22) $569
  • Vice President (92) $362
  • 3rd+ Year Associate (90) $280
  • 2nd Year Associate (205) $268
  • 1st Year Associate (387) $229
  • 3rd+ Year Analyst (29) $154
  • 2nd Year Analyst (83) $134
  • 1st Year Analyst (246) $122
  • Intern/Summer Associate (32) $82
  • Intern/Summer Analyst (314) $59
notes
16 IB Interviews Notes

“... there’s no excuse to not take advantage of the resources out there available to you. Best value for your $ are the...”

Leaderboard

1
redever's picture
redever
99.2
2
Betsy Massar's picture
Betsy Massar
99.0
3
Secyh62's picture
Secyh62
99.0
4
BankonBanking's picture
BankonBanking
99.0
5
GameTheory's picture
GameTheory
98.9
6
dosk17's picture
dosk17
98.9
7
kanon's picture
kanon
98.9
8
CompBanker's picture
CompBanker
98.9
9
numi's picture
numi
98.8
10
DrApeman's picture
DrApeman
98.8
success
From 10 rejections to 1 dream investment banking internship

“... I believe it was the single biggest reason why I ended up with an offer...”