Renewables IB is Paradise
It's 2:47 AM. You're a second-year analyst at a middle-market investment bank's Energy Transition group. You've been awake for 21 hours, and your VP has just asked you to rerun the tax equity waterfall for a 62 MW solar development outside Topeka, Kansas.
The project has no interconnection agreement, no offtake contract, and no realistic prospect of reaching commercial operation before 2078. Your client has described it as a generational infrastructure asset.
You're not just an investment banker, you're saving the planet.
You open your 86-tab Excel model. The file is named "Project_Sunrise_Model_v47_FINAL_FINAL_Updated_11.18.xlsm". It takes four minutes to open. There are 37 circular references. You have no idea what 12 of the worksheets do. The model was originally built by an associate who left for Brookfield in 2022.
Your VP calls.
"Can we sensitize the merchant tail?"
Of course.
You have spent the last six hours forecasting wholesale electricity prices in southwestern Kansas through 2057. Your assumptions are based on a third-party consultant's power price forecast, which costs $85,000 and was last updated before the Inflation Reduction Act.
You increase the terminal-year power price by $2/MWh. The equity IRR jumps from 6.8% to 14.2%. The project is now financeable.
At 8:30 AM, you join a call with the client. Their CEO is a former commercial real estate broker who founded the company in 2021 after watching a documentary about climate change. The company has four employees, $600,000 in annual G&A, and a 9 GW development pipeline. None of the projects are operational.
Your MD describes them as "one of the premier independent renewable energy platforms in North America."
The CEO explains that 7 GW of the pipeline is currently awaiting interconnection studies. Another 1.5 GW is on land the company does not yet own. The remaining 500 MW is in a jurisdiction that recently banned utility-scale solar development.
At 11:45 AM, your associate asks you to prepare a buyer universe. You include Brookfield, BlackRock, KKR, Copenhagen Infrastructure Partners, and every Canadian pension fund you can think of.
Your VP asks you to add NextEra.
At 3:00 PM, you have an internal meeting to discuss valuation. Your comps include three publicly traded renewable developers, a European utility, and a SPAC that went bankrupt in 2023.
The median EV/EBITDA multiple is 18.4x.
Your target has negative EBITDA.
You apply the multiple to 2034 projected EBITDA instead. The implied enterprise value is $3.7 billion. Your MD says the valuation looks conservative.
At 4:45 PM, you receive a confidential process update. CIBC, RBC, PEI, and Santander have all been pitching the same client for six months. Each bank claims to have a proprietary relationship with management. None has received a mandate.
At 7:30 PM, you order Sweetgreen. You select the carbon-neutral delivery option. It costs an extra $0.49, you feel good about yourself.
At 10:15 PM, the client sends an updated development pipeline. They have added 2 GW of battery storage projects in ERCOT. The projects have no land rights, no permits, and no interconnection applications.
Your associate tells you to include them in the valuation.
You ask what revenue assumptions to use.
"Just use the consultant's curve."
You open the consultant's report. The entire investment thesis depends on capturing electricity price spikes during extreme weather events in Texas.
You are monetizing climate change to fight climate change, it's beautiful.
At 1:30 AM, your MD sends a firmwide email congratulating the team on its commitment to accelerating global decarbonization. He is writing from a private aviation terminal on his way to an energy transition conference in Dubai.
You reply, "Thank you, excited to be part of it."
At 3:12 AM, the model finally balances.
The project generates a 7.1% levered IRR.
You increase the investment tax credit assumption.
It generates 11.6%, you save the file.
Outside your office window, the Manhattan skyline glows with the light of a million electric bulbs. Somewhere in Pennsylvania, a combined-cycle natural gas plant is running at full capacity to keep them on.
You smile.
Renewables IB is paradise.
Sint sunt neque eos qui ut dicta. Pariatur quod et non sequi. Dolorem quo ut ex quis sed eveniet. Ratione est architecto tempore ipsam laborum rerum. Deserunt aut distinctio quaerat amet. Eligendi occaecati minima amet aut. Sunt eos ullam ducimus dolorem et fugit iste magnam.
Quibusdam voluptatem molestias ut velit sed corporis ea sit. Culpa ipsam sapiente quia excepturi magnam illum est. Fuga voluptatem optio fugiat.
Et ut non quis qui et occaecati. Aut sit sequi enim voluptatibus. Dignissimos rerum a nulla quis et dolorum ut. Perferendis iste et autem.
See All Comments - 100% Free
WSO depends on everyone being able to pitch in when they know something. Unlock with your email and get bonus: 6 financial modeling lessons free ($199 value)
or Unlock with your social account...